STATUS OF ELECTRIFICATION
Potential Energized Percentage Towns 9 9 100% Barangays 132 132 100% House Connections 24,100 23,558 98% Note: with seven (7) isolated Barangays energized using gensets.
CATEGORIZATION
1985 – D 1995 – D 2005 – A+ 2015 – AAA
1986 – C 1996 – C 2006 – A+ 2016- AAA
1987 – C 1997 – A 2007 – A+ 2017- AAA
1988 – C 1998 – A 2008 – A+ 2018- AAA
1989 – C 1999 – A+ 2009 – A+
1990 – C 2000 – A+ 2010 – A+
1991 – C 2001 – A+ 2011 – A+
1992 – D 2002 – A+ 2012 – AAA
1993 – D 2003 – A+ 2013 – AAA
1994 – D 2004 – A+ 2014 – AAA
KILOMETERS OF LINE
Underbuilt – 154.671 kms
Single Phase – 237.738 kms
V-Phase – 26.851 kms
3-Phase – 92.642 kms
Open Secondary – 153.969 kms
Total – 665.871 kms