STATUS OF ELECTRIFICATION

STATUS OF ELECTRIFICATION

Potential Energized Percentage Towns 9 9 100% Barangays 132 132 100% House Connections 24,100 23,558 98% Note: with seven (7) isolated Barangays energized using gensets.

CATEGORIZATION

1985 – D      1995 – D        2005 – A+        2015 – AAA
1986 – C      1996 – C         2006 – A+        2016- AAA
1987 – C      1997 – A         2007 – A+        2017- AAA
1988 – C      1998 – A         2008 – A+        2018- AAA
1989 – C      1999 – A+       2009 – A+
1990 – C      2000 – A+       2010 – A+
1991 – C      2001 – A+       2011 – A+
1992 – D      2002 – A+       2012 – AAA
1993 – D      2003 – A+       2013 – AAA
1994 – D      2004 – A+       2014 – AAA


KILOMETERS OF LINE

Underbuilt – 154.671 kms
Single Phase – 237.738 kms
V-Phase – 26.851 kms
3-Phase – 92.642 kms
Open Secondary – 153.969 kms
Total – 665.871 kms