Status of Electrification

STATUS OF ELECTRIFICATION

Potential Energized Percentage Towns 9 9 100% Barangays 132 132 100% House Connections 24,100 23,558 98% Note: with seven (7) isolated Barangays energized using gensets.


CATEGORIZATION

1985 - D      1995 - D        2005 - A+        2015 - AAA
1986 - C      1996 - C         2006 - A+        2016- AAA
1987 - C      1997 - A         2007 - A+ 
1988 - C      1998 - A         2008 - A+
1989 - C      1999 - A+       2009 - A+
1990 - C      2000 - A+       2010 - A+
1991 - C      2001 - A+       2011 - A+
1992 - D      2002 - A+       2012 - AAA
1993 - D      2003 - A+       2013 - AAA
1994 - D      2004 - A+       2014 - AAA


KILOMETERS OF LINE

Underbuilt – 154.671 kms
Single Phase – 237.738 kms
V-Phase – 26.851 kms
3-Phase – 92.642 kms
Open Secondary – 153.969 kms
Total – 665.871 kms